Winter improvements on Kairos: Might as well….

We started off the winter with a few plans  for some updates to Kairos.  First on the list was to replace the upholstery in the saloon that was badly stained and a source of smell from a diesel fire from five or so years ago.  We had previously developed our sewing skills with Sunbrella for replacing the upholstery and chose to give it a try with Ultraleather:

IMG_20170128_173247
Saloon Before
20180112_231740
Comfortable Seating
IMG_20180112_212833
Saloon After

So after tackeling the saloon with good results we figured we might as well redo the Pilot House upholstery to match:

IMG_20170527_121418
Pilot house before
IMG_20180205_112404
Pilot House after

And then we thought we might as well add some area carpets throughout the boat, so we made up some templates, then got on with cutting and binding the pieces:

20180112_215703
Creating a template

 

We then proceeded to replace the remaining interior halogen strip lighting with LED strips then moved on to exterior projects.

Having updated our interior lighting to LEDs we thought we might as well add some underwater LEDs while we were working on electrical projects.

Our next sewing project was the fabrication of a new windshield cover to replace the badly worn and and faded one as well as constructing bow cushions for cruising on warm summer days.

One of our maintenance projects involved the caulking between the cap rails and the gunnels which needed to be redone as there was cracking and potential for water intrusion so we decided that we might as well tackle another project….The teak cap rails around the boat which had been previously awl-gripped white and were starting to show signs of wear, with many areas chipped and scratched.  We had considered stripping the rails back down to bare teak and finishing with varnish but that project would have taken much too long, with our available time only on weekends and warmer weather would be required.  As an alternative we found a urethane paint in a color we thought would give Kairos the appearance, at least from a distance, that we desired, adding contrast to her fine lines.  So after removing all the old caulking we began this painting project…

20180414_140741
mixing paint
peter brush painting rail
brushing
20180414_140224
rolling
20180414_140132
first coat port
20180414_140128
first coat starboard
IMG_20180414_170043
Sheryl consulting on the project
IMG_20180430_161637
Starboard side view
IMG_20180430_161659
Port Forward
IMG_20180430_161707
Port aft.
IMG_20180430_161750
Starboard Portuguese bridge

 

Additionally we had weeping from the entry gates from water intrusion.  This produced brown staining by “teak water” on Kairos’s decks throughout the previous season and into storage.  We removed the gates and found that there was no bedding for either the hinges nor the latching hardware.  The four gates were removed and brought home for reconstruction.

We cut openings in the bottom of each gate to remove the saturated open core foam  spacers to allow the interior of the gates to dry out, facilitated by low temperature oven drying.  Unfortunately one of the gates was exposed to extreme temperatures resulting in complete gelcoat delamination… and a total gate rebuild.   Each of the gates had a variety of minor imperfections which were ultimately repaired with epoxy and all four gates received new color matched gelcoat and will be remounted with appropriate bedding to prevent subsequent further water intrusion and damage.

four gates with new gelcoat
Four gates with new gelcoat

Our water speed transducer was no longer functional so I figured that we might as well replace it with an ultrasonic speed transducer, which is more resistant to fouling.  While working on transducers we thought we might as well replace a one of the transducers which was no longer being used with a new CHIRP transducer for better bottom imaging.

Removing the old transducer was quite a challenge but was accomplished without any damage to the hull or the transducer which was resold.

 

Working into the night to try to get Kairos ready for launch:

Trying to save an antenna that had delamination of its fiberglass we thought we would try some cable shrinkwrap to recover it….

shrinkwrap antenna

Nearly ready to launch….  after just a little bottom paint:

peter breakfast
Breakfast: Fruit, yogurt and granola before starting the bottom paint
sheryl bottom paint 2
Sheryl’s first time to endure the joys of bottom painting
working around the poppits
Working around the poppits
sheryl bottom paint
Proud of her work.
peter fine lines
Perfectionist Peter at the waterline

More to come after the launch…..finally

5 thoughts on “Winter improvements on Kairos: Might as well….

  1. awesome job on the winter projects…. new interior looks great, and i love the WOOD rails! it looks so much nicer and classy!

    can you teach me to sew ?!

    hope all is well,

    ray

    Like